Quorval
Not just a meeting tool — a full business analysis platform, end to end, scaling from a single business analyst (BA) to a full PM and BA team
Visit the Quorval product site ↗▶ Watch video walkthrough
Outcome
From meeting to signed, audit-ready requirements in one place.
- ✓Requirements are captured during the call, with the quote that proves them
- ✓Audit evidence builds itself as the work happens, instead of being assembled at the end
- ✓Coverage gaps surface before testing, not at go-live
- ✓One workspace replaces five separate tools
- The challenge
- Business analysts and delivery teams juggle a recorder, a requirements tool, a risk register, a change log, e-signatures, Jira and a pile of documents. Decisions made in meetings get lost between them — and in regulated companies the audit evidence ends up scattered across email and shared drives.
- How I led it
- Founder, product owner, designer and quality lead. I defined the product vision, the Business Analysis Body of Knowledge (BABOK) and validation methodology behind it, wrote the compliance requirements and trust documents, built the go-to-market and investor materials, and directed artificial intelligence (AI)-assisted development end to end.
- What I delivered
- Quorval puts capture, analysis, requirements, traceability, risk, approvals and evidence into one workspace. A decision made in a meeting becomes a cited requirement that stays linked to its risks, tests, changes and sign-offs, so nothing is lost between tools and the audit trail is built while the work happens.
Deep dive
Open any section for detailHow it worksFrom conversation to validated go-live
- 01
Capture
Meeting bot or manual recording, live transcript, speaker attribution
- 02
Analyze
AI coach flags requirements, risks and follow-up questions
- 03
Author
BABOK-tagged requirements, rules, diagrams and documents
- 04
Trace
Requirement ↔ risk ↔ test ↔ change, with gap detection
- 05
Approve
Part 11 e-signatures at 6 lifecycle gates
- 06
Evidence
Portable Document Format (PDF) audit packets and evidence rooms
Challenge and solution, side by side4 examples
- ChallengeRequirements are lost between the meeting and the document.SolutionThe AI coach flags requirements and risks live, and each one is saved with the source quote and the meeting moment it came from.
- ChallengeAudit evidence is scattered across email and drives.SolutionPart 11 e-signatures, an immutable audit trail and one-click PDF audit packets bundle the clip, requirement, sign-off and requirements traceability matrix (RTM) together.
- ChallengeGaps are found late, at testing or go-live.SolutionBidirectional traceability with gap detection and auto-generated user acceptance testing (UAT) scripts show uncovered requirements early.
- ChallengeExisting work and documents must be re-entered into the analysis workspace.SolutionThe frontend application programming interface (API) Connection Hub maps and imports external records into Quorval, with saved configurations, duplicate detection and run reports. Six provider import handlers are implemented.
Product focus and qualityFocus, validation approach and key features
Product focus
Quality & validation
Key features
- ·Meeting bot or manual capture for Zoom, Teams, Meet and in-person, with live transcription and speaker attribution
- ·Session prep from meeting type and uploaded customer context (agenda, talking points, prep notes), live coverage tracking against the topic roadmap and a break-time BA scorecard
- ·Junior BA Coach: methodology education, worked examples, common pitfalls and checks for understanding, separate from product-navigation help
- ·Citation-enabled RAG coaching retrieves methodology and regulatory passages to ground guidance; AI answers and citations still require review
- ·Requirements, business rules and data mappings tagged to BABOK, with source quotes
- ·21 BABOK diagrams and process intelligence generated from transcripts
- ·Document mining: SOPs, RFPs and legacy specs turned into cited draft requirements
- ·One-click BRDs, FRDs, minutes, UAT plans and PDF audit packets
- ·Traceability matrix, risk register, CAPA, root-cause analysis and impact management
- ·Regulation library with conflict review and change calendar
- ·Project plans with Gantt, milestones, calendar invites and multi-party approvals
- ·7 lifecycle phases and 6 signed gates (Charter, URS, Design, Build, TSR, Go-Live)
- ·Stakeholder portal, pulse surveys and Delivery Hub guided walkthroughs
- ·Supervisor dashboards, BA performance scores and skill assessments
- ·Frontend API Connection Hub: provider setup, field mapping, saved import configurations, duplicate detection, Run Sync and detailed reports
- ·Implemented inbound API import handlers for Jira, Confluence, GitHub, Linear, Asana and Notion; live connections require configuration
- ·Configuration-dependent calendar import and automatic meeting capture, with Recall.ai event-triggered insights and analysis
- ·BI API, bring-your-own storage, vendor marketplace and support desk
Why it matters
Junior BA supportSession prep, live coverage and the break-time scorecard
Quorval supports less-experienced business analysts with a Junior BA Coach that teaches the craft alongside the delivery workflow, rather than only explaining where to click.
- ·Methodology coaching explains the why, how and when of elicitation, requirements analysis, stakeholder engagement, traceability, validation and change management.
- ·Worked examples and sample artifacts turn guidance into practical stakeholder maps, communication plans and other analysis outputs.
- ·Substantive methodology answers include common pitfalls, suggested corrections and a check-for-understanding question; navigation questions receive concise product help instead.
- ·Citation-enabled RAG retrieves methodology and regulatory passages, combining semantic and keyword matching for methodology references and industry filtering for regulatory guidance.
- ·Meeting prep: the analyst uploads available customer information and selects the meeting type, which sets the background structure and expected outputs — Quorval prepares the agenda, talking points and prep notes.
- ·Live coverage tracking: during the session, the tool analyzes the discussion against the topic roadmap in real time, indicating coverage while the analyst follows the tracking sheet, adds notes or marks topics as omitted.
- ·Break-time scorecard: a session score card scores the BA on coverage and flags missed or omitted topics, so every session can be reviewed and the next one planned better.
- ·With automatic capture configured, meeting events then trigger analysis that turns the discussion into source-linked draft requirements and deliverables for review.
- ·AI-initiative coaching is instructed to address NIST AI RMF, EU AI Act risk tiers and explicit human-review checkpoints, asking for context before asserting a risk tier.
Frontend API Connection HubJira · Confluence · GitHub · Linear · Asana · Notion
A frontend Integration Hub makes external-source imports configurable inside the business analysis platform: select a provider and record type, map source fields to Quorval records, save the configuration, run an import and inspect its results.
Connection management
- ·Provider catalog and connection setup, with saved import configurations
- ·Field-mapping studio for source fields and destination records
- ·Duplicate-detection settings and external-to-local record mappings
- ·Run Sync action with progress feedback and last-run information
- ·Reports showing fetched, created, updated and failed records with error details
Implemented inbound API handlers
Event-triggered processing
Scope, notable components and compliance
Measurable scope
- ·87 backend services built and running in production
- ·90 app screens across 7 lifecycle phases and 6 signed gates
- ·178 versioned database changes, with access rules for each tenant
- ·5 published trust and compliance documents
Notable & novel components
- ·Session prep from meeting type and customer context: agenda, talking points and prep notes
- ·Live coverage tracking against the meeting's topic roadmap, with a break-time BA scorecard
- ·Hash-chained 21 CFR Part 11 e-signatures with re-verification
- ·Auto-traceability: AI links requirements to risks, tests and changes
- ·Process intelligence: compare a recorded process with what people said they do
- ·Scheduled AI evaluations and model cards to monitor AI quality
- ·Learning memory and BABOK method embeddings that shape AI output
Compliance work
- ·Designed to 21 CFR Part 11, GxP and GAMP 5; SOX-ready mode
- ·Immutable audit trail, CAPA, RCA and FMEA risk scoring
- ·GDPR Data Processing Addendum, Security Addendum, Subprocessor List
- ·Security & LLM Data Use Compliance Statement; Vulnerability Disclosure Policy
- ·MFA, data retention cleanup, account deletion and AI usage logging
Inside the app and demo videos8 screens · 1 demo video
Demo videos
Proof of workLive product, presentations and downloadable documents
See the full product story on the product page
Visit quorval.com ↗
Live transcript with the private AI coach, which catches requirements and risks during the call
AI document generator: business requirements documents (BRDs), functional requirements documents (FRDs) and minutes created from meetings
AI diagram builder: 21 BABOK diagram types
Traceability matrix with coverage and gap detection
Project plans with tracked calendar invites
Workspace setup by role profile
Built for regulated environments: International Organization for Standardization (ISO) 9001, 21 CFR Part 11, GAMP 5
Integration Hub and field mappingValidation package · preview
19 controlled documents (QV-001 – QV-019) following plan → executed protocol → evidence → deviation → report, aligned to Good Automated Manufacturing Practice (GAMP) 5, 21 Code of Federal Regulations (CFR) Part 11, International Organization for Standardization (ISO) 9001 and International Council for Harmonisation (ICH) Q10. View-only excerpts — full documents available on request.
Document register (19)›
- QV-001Validation OverviewOverview
- QV-002Master Validation PlanPlan
- QV-003Document / Portal / Email Validation PlanPlan
- QV-004Multi-Role Test Protocol (Executed)Protocol
- QV-005Org Admin Test Protocol (Executed)Protocol
- QV-006Document / Portal / Email Protocol (Executed)Protocol
- QV-007Workspace Test Protocol (Executed)Protocol
- QV-008Multi-Role Screenshot EvidenceEvidence
- QV-009Document / Portal / Email EvidenceEvidence
- QV-010Workspace Test EvidenceEvidence
- QV-011Diagram Generation EvidenceEvidence
- QV-012Diagram Types EvidenceEvidence
- QV-013E-Signature Screenshot EvidenceEvidence
- QV-014Multi-Role DeviationsDeviation
- QV-015Document / Portal / Email DeviationsDeviation
- QV-016Workspace Test DeviationsDeviation
- QV-017Test Deviations — Cycle 1Deviation
- QV-018Document / Portal / Email Final ReportReport
- QV-019Final Validation Summary ReportReport
Scope — 20 functional areas · 95 test cases
- Authentication & Session Management (6)
- Dashboard & Navigation (5)
- Org Admin — User Management (6)
- Org Admin — Settings (5)
- Org Admin — Access & Features (3)
- Org Admin — Meeting Types (5)
- Org Admin — Integrations (3)
- Org Admin — Homescreen Notes (2)
- Org Admin — Data application programming interface (API) & Storage (3)
- Org Admin — Data Import (3)
- Projects / Customers (8)
- Meeting Lifecycle — Scheduled (5)
- Meeting Lifecycle — In-Session (6)
- Meeting Lifecycle — Completed (4)
- Documents Hub (6)
- Requirements Register (8)
- Risk Register (5)
- Task Management (5)
- Delivery Hub (3)
- Data Governance & General Data Protection Regulation (GDPR) (4)
1. Authentication & Session Management
| Test ID | Test step | Expected result | Result |
|---|---|---|---|
| AUTH-001 | Navigate to login page | Login form displayed with email/password fields | PASS |
| AUTH-003 | Verify session persistence on page refresh | User remains authenticated | PASS |
13. Meeting Lifecycle — In-Session
| Test ID | Test step | Expected result | Result |
|---|---|---|---|
| MTG-IS-001 | Open an in-session meeting | In-session view loaded with recording controls | PASS |
| MTG-IS-002 | Verify artificial intelligence (AI) Question Box is present | Collapsed accordion with AI Q&A visible | PASS |
16. Requirements Register
| Test ID | Test step | Expected result | Result |
|---|---|---|---|
| REQ-001 | Navigate to Requirements hub | Requirements list displayed | PASS |
| REQ-002 | View requirement details | Full requirement with category, priority, status | PASS |
Presentations
Platform OverviewGeneral / executive · 1 page›
- ·One AI-native workspace replaces 5 tools: recorder, requirements, risk register, change log, e-signature
- ·Meeting → insight → BABOK-tagged requirement in one pipeline
- ·Bidirectional traceability: requirement ↔ risk ↔ test ↔ change
- ·21 CFR Part 11 e-signatures with cryptographic hash chains
- ·7 lifecycle phases, 6 signed gates, 1 source of truth
- ·Industries: life sciences (GxP), financial services (SOX), enterprise IT, consulting
For the BA PractitionerBusiness analysts · 1 page›
- ·Live Zoom, Teams, Meet and in-person capture with speaker attribution
- ·One click from insight to categorized, prioritized requirement with source quote
- ·21 BABOK diagrams generated from transcripts
- ·Document mining: SOPs, RFPs and legacy specs → cited draft requirements
- ·Four working modes: elicit, author from docs, model first, or hybrid
For the BA Practice LeaderBA managers / practice heads · 1 page›
- ·BA Performance Score per consultant
- ·Portfolio RAG roll-up, drill down to the blocking requirement
- ·Method library keeps every project on standard
- ·4-week onboarding with objective checkpoints
- ·Audit-ready evidence rooms: clip, requirement, sign-off and RTM in one PDF
- ·Standard gates: Charter, URS, Design, Build, TSR, Go-Live
For the PM / Delivery LeadProject & delivery managers · 1 page›
- ·Multi-party sequential or parallel approvals with reminders and escalation
- ·FMEA risk scoring linked to requirements; RPN drives go/no-go
- ·Cited decision log with meeting clip, alternatives and signer
- ·Stakeholder portal for sponsors — no VPN or extra license
- ·Agile, waterfall, hybrid and validated (21 CFR / GAMP 5) delivery
- ·Recovery mode for stalled projects
Investor PackageInvestors (pre-seed / angel) · 18 pages›
- ·Executive summary; mission, vision & objectives
- ·Market analysis (BA tools market >$12B)
- ·Platform tiers already built: Professional, Team, Enterprise
- ·Product & technology: 12+ core modules
- ·Go-to-market, business model and revenue projections
- ·Team, operations and competitive landscape vs Jira, Aha!, Fireflies, Otter, Notion
- ·Valuation, deal terms, 5-year financials
- ·Risks & mitigations, roadmap, use of funds
Live: quorval.com
Tech stack and skills
Tech stack
Skills demonstrated
▤ README.md›
# Quorval > Not just a meeting tool — a full business analysis platform, end to end, scaling from a single BA to a full PM and BA team An artificial intelligence (AI)-native business analysis and delivery platform: meetings become Business Analysis Body of Knowledge (BABOK)-tagged requirements, traceability, risk, signed approvals and audit-ready evidence — in one validated workspace. ## Outcome **From meeting to signed, audit-ready requirements in one place.** - Requirements are captured during the call, with the quote that proves them - Audit evidence builds itself as the work happens, instead of being assembled at the end - Coverage gaps surface before testing, not at go-live - One workspace replaces five separate tools ## Problem Business analysts and delivery teams juggle a recorder, a requirements tool, a risk register, a change log, e-signatures, Jira and a pile of documents. Decisions made in meetings get lost between them — and in regulated companies the audit evidence ends up scattered across email and shared drives. ## Solution Quorval puts capture, analysis, requirements, traceability, risk, approvals and evidence into one workspace. A decision made in a meeting becomes a cited requirement that stays linked to its risks, tests, changes and sign-offs, so nothing is lost between tools and the audit trail is built while the work happens. | Problem | Solution | | --- | --- | | Requirements are lost between the meeting and the document. | The AI coach flags requirements and risks live, and each one is saved with the source quote and the meeting moment it came from. | | Audit evidence is scattered across email and drives. | Part 11 e-signatures, an immutable audit trail and one-click Portable Document Format (PDF) audit packets bundle the clip, requirement, sign-off and requirements traceability matrix (RTM) together. | | Gaps are found late, at testing or go-live. | Bidirectional traceability with gap detection and auto-generated user acceptance testing (UAT) scripts show uncovered requirements early. | | Existing work and documents must be re-entered into the analysis workspace. | The frontend application programming interface (API) Connection Hub maps and imports external records into Quorval, with saved configurations, duplicate detection and run reports. Six provider import handlers are implemented. | ## Features - Meeting bot or manual capture for Zoom, Teams, Meet and in-person, with live transcription and speaker attribution - Session prep from meeting type and uploaded customer context (agenda, talking points, prep notes), live coverage tracking against the topic roadmap and a break-time BA scorecard - Junior BA Coach: methodology education, worked examples, common pitfalls and checks for understanding, separate from product-navigation help - Citation-enabled retrieval-augmented generation (RAG) coaching retrieves methodology and regulatory passages to ground guidance; AI answers and citations still require review - Requirements, business rules and data mappings tagged to BABOK, with source quotes - 21 BABOK diagrams and process intelligence generated from transcripts - Document mining: standard operating procedures (SOPs), RFPs and legacy specs turned into cited draft requirements - One-click business requirements documents (BRDs), functional requirements documents (FRDs), minutes, UAT plans and PDF audit packets - Traceability matrix, risk register, corrective and preventive action (CAPA), root-cause analysis and impact management - Regulation library with conflict review and change calendar - Project plans with Gantt, milestones, calendar invites and multi-party approvals - 7 lifecycle phases and 6 signed gates (Charter, user requirements specification (URS), Design, Build, test summary report (TSR), Go-Live) - Stakeholder portal, pulse surveys and Delivery Hub guided walkthroughs - Supervisor dashboards, BA performance scores and skill assessments - Frontend API Connection Hub: provider setup, field mapping, saved import configurations, duplicate detection, Run Sync and detailed reports - Implemented inbound API import handlers for Jira, Confluence, GitHub, Linear, Asana and Notion; live connections require configuration - Configuration-dependent calendar import and automatic meeting capture, with Recall.ai event-triggered insights and analysis - BI API, bring-your-own storage, vendor marketplace and support desk ## Tech stack - React + TypeScript - Vite - Tailwind / Radix UI - Lovable Cloud (Postgres, auth, storage, serverless functions) - Lovable AI Gateway (Gemini models, embeddings) - Recall.ai meeting bots - Resend email - React Flow, Excalidraw, tldraw, Mermaid, PlantUML - docx / jsPDF / ExcelJS exports - Playwright tests ## Junior BA support Quorval supports less-experienced business analysts with a Junior BA Coach that teaches the craft alongside the delivery workflow, rather than only explaining where to click. - Methodology coaching explains the why, how and when of elicitation, requirements analysis, stakeholder engagement, traceability, validation and change management. - Worked examples and sample artifacts turn guidance into practical stakeholder maps, communication plans and other analysis outputs. - Substantive methodology answers include common pitfalls, suggested corrections and a check-for-understanding question; navigation questions receive concise product help instead. - Citation-enabled RAG retrieves methodology and regulatory passages, combining semantic and keyword matching for methodology references and industry filtering for regulatory guidance. - Meeting prep: the analyst uploads available customer information and selects the meeting type, which sets the background structure and expected outputs — Quorval prepares the agenda, talking points and prep notes. - Live coverage tracking: during the session, the tool analyzes the discussion against the topic roadmap in real time, indicating coverage while the analyst follows the tracking sheet, adds notes or marks topics as omitted. - Break-time scorecard: a session score card scores the BA on coverage and flags missed or omitted topics, so every session can be reviewed and the next one planned better. - With automatic capture configured, meeting events then trigger analysis that turns the discussion into source-linked draft requirements and deliverables for review. - AI-initiative coaching is instructed to address National Institute of Standards and Technology (NIST) AI Risk Management Framework (RMF), European Union (EU) AI Act risk tiers and explicit human-review checkpoints, asking for context before asserting a risk tier. ## Frontend API Connection Hub A frontend Integration Hub makes external-source imports configurable inside the business analysis platform: select a provider and record type, map source fields to Quorval records, save the configuration, run an import and inspect its results. - Provider catalog and connection setup, with saved import configurations - Field-mapping studio for source fields and destination records - Duplicate-detection settings and external-to-local record mappings - Run Sync action with progress feedback and last-run information - Reports showing fetched, created, updated and failed records with error details Implemented inbound handlers: Jira, Confluence, GitHub, Linear, Asana, Notion. Separate from these user-run imports, calendar-import and automatic meeting-bot jobs are implemented. With valid connections and automatic capture enabled, Recall.ai transcript events can trigger live insights and its completion callback can trigger analysis and draft requirement creation. ## Notable components - Session prep from meeting type and customer context: agenda, talking points and prep notes - Live coverage tracking against the meeting's topic roadmap, with a break-time BA scorecard - Hash-chained 21 Code of Federal Regulations (CFR) Part 11 e-signatures with re-verification - Auto-traceability: AI links requirements to risks, tests and changes - Process intelligence: compare a recorded process with what people said they do - Scheduled AI evaluations and model cards to monitor AI quality - Learning memory and BABOK method embeddings that shape AI output ## Compliance - Designed to 21 CFR Part 11, good practice requirements (GxP) and Good Automated Manufacturing Practice (GAMP) 5; Sarbanes–Oxley Act (SOX)-ready mode - Immutable audit trail, CAPA, root cause analysis (RCA) and failure mode and effects analysis (FMEA) risk scoring - General Data Protection Regulation (GDPR) Data Processing Addendum, Security Addendum, Subprocessor List - Security & large language model (LLM) Data Use Compliance Statement; Vulnerability Disclosure Policy - multi-factor authentication (MFA), data retention cleanup, account deletion and AI usage logging ## Scope - 87 backend services built and running in production - 90 app screens across 7 lifecycle phases and 6 signed gates - 178 versioned database changes, with access rules for each tenant - 5 published trust and compliance documents ## Links - Live: https://quorval.com ## Author Candace Hagood · Product & Quality Leader · AI-Assisted Engineering